Pulworthy Brook is currently at Moderate Ecological Status. The failing elements are fish, invertebrates, phytobenthos, phosphate and dissolved oxygen, making this one of the more ecologically impaired water bodies in the upper Torridge system. Fish EQR is 0.286 (below the Good threshold of 0.40), invertebrate ASPT is 0.728 (just above the Moderate threshold of 0.72), phytobenthos is 0.446 (below the Good threshold of 0.60), phosphate is 0.078 mg/l (above the Good threshold of 0.049 mg/l), and dissolved oxygen is 69.4% (below the Good threshold of 75%).
The Environment Agency has identified poor nutrient management, poor soil management, low flow (not drought) as the key pressures. The catchment contains 49 farms, is around 24% farmland, and phosphorus source modelling suggests livestock contributes approximately 49% of phosphorus loading, with wastewater contributing approximately 35%. This points towards a genuinely mixed agricultural and wastewater pressure profile.
The presence of both biological and physico-chemical failures suggests that recovery will require broader action than simply addressing a single pollutant source. Soil management, nutrient delivery and flow-related pressures all appear likely to be contributing to ecological stress.
Click the map to select a river catchment, or enter a postcode
Eco Class Good Moderate Poor Bad
Catchment Ranking: 76/92
Catchment Ranking
The ranking is derived from the EA 2025 classification data. Parameter scores are normalised and an average is taken. Rankings are restricted to prevent e.g. a "moderate" river being ranked higher than a "poor" river.
(92 river waterbodies in the North Devon Catchment)
EA Ecological Classification
- 2022Moderate
- 2019Moderate
- 2016Poor
Failing Elements
- Dissolved oxygen
- Fish
- Invertebrates
- Phosphate
- Phytobenthos Sub Element
EA RNAGs
- Low Flow (not drought)
- Poor nutrient management
- Poor soil management
Pulworthy Brook
Why is the river failing?
What is happening now?
Current activity includes Northern Devon Natural Solutions, regulatory farm inspections, investigations into the causes of failure and Devon Woods projects.
Risk Levels
Risk Levels
- SWW Overflows: Total duration of intermittent spills for all CSOs in the catchment for 2025.
- Private Sewage: Density rating based upon non-SWW properties in the catchment.
- Livestock: APHA data from Feb 2026.
- Runoff: ESME modelling (wf_r24).
- Modification: ESME modelling (aa_r1).
- Invasive Species: ESME modelling (iv_r17).
- Overheating: derived from tree cover ESME modelling (wq_r10).
- Running Dry: Abstraction sustainability ESME modelling (ws_r27).
- Untreated SewageHigh
- ModificationMedium
- Sewage (Private)Very Low
- Invasive SpeciesHigh
- LivestockMedium
- OverheatingLow
- RunoffMedium
- Running DryVery Low
Intervention hypothesis (confidence: Med-High)
Pulworthy Brook appears to be a genuinely diffuse catchment problem rather than a single dominant pressure. Fish, invertebrates, dissolved oxygen, phosphate and phytobenthos are all below Good status. Livestock is the largest modelled phosphorus source, but wastewater remains a significant secondary contributor. The RNAGs also highlight poor soil management and flow-related pressures.
The most plausible route to recovery is therefore a catchment-wide agricultural improvement programme focused on nutrient and soil management, supported by wastewater improvements where necessary. Given the uncertainty identified by the Environment Agency, further investigation remains appropriate, particularly if recovery is not observed after agricultural improvements.
| Intervention | Size of Intervention | Estimated Cost | Lead |
|---|---|---|---|
| PRIORITY INTERVENTIONS (NOT IN ORDER OF PRIORITY) | |||
| Investment in STWs (phosphate reduction) | AMP8 | £3m | SWW |
| Investment in storm overflows (reduction in spills) | AMP9 | £7m | SWW |
| Regulatory enforcement to drive compliance with Farming Rules for Water | c.13 priority farms | £26,000 | EA |
| Soil health interventions | c.13 priority farms | £364,000 | NE/DWT/WRT/EA |
| Fish data | £6,000 | WRT | |
| Special case interventions – low flow | £250,000 | To establish | |