Wooleigh Brook is currently at Moderate Ecological Status. The principal failing element is phosphate, with concentrations of 0.071 mg/l, above the Good threshold of 0.047 mg/l. Fish are achieving Moderate status (EQR 0.248), invertebrates remain High status, and macrophytes and phytobenthos are achieving Good status. The ecological impact therefore appears less severe than might be expected from the phosphate concentration alone.
The Environment Agency has identified poor nutrient management and continuous sewage discharges as RNAGs. The catchment receives water from Whitsleigh Down Brook, which is also failing on nutrient enrichment indicators, suggesting that part of the nutrient burden may already be present before reaching Wooleigh Brook.
Source apportionment indicates 95% phosphorus load is from continuous wastewater discharge. Phosphate remains the key issue and is the principal reason the water body has not achieved Good Ecological Status.
Click the map to select a river catchment, or enter a postcode
Eco Class Good Moderate Poor Bad
Catchment Ranking: 37/92
Catchment Ranking
The ranking is derived from the EA 2025 classification data. Parameter scores are normalised and an average is taken. Rankings are restricted to prevent e.g. a "moderate" river being ranked higher than a "poor" river.
(92 river waterbodies in the North Devon Catchment)
EA Ecological Classification
- 2022Moderate
- 2019Moderate
- 2016Moderate
Failing Elements
- Phosphate
EA RNAGs
- Poor nutrient management
- Sewage discharge (continuous)
Woolleigh Brook
Why is the river failing?
What is happening now?
Current activity includes a nutrient management plan, Devon Woods, regulatory farm inspections, review of discharge permits and Northern Devon Natural Solutions.
Risk Levels
Risk Levels
- SWW Overflows: Total duration of intermittent spills for all CSOs in the catchment for 2025.
- Private Sewage: Density rating based upon non-SWW properties in the catchment.
- Livestock: APHA data from Feb 2026.
- Runoff: ESME modelling (wf_r24).
- Modification: ESME modelling (aa_r1).
- Invasive Species: ESME modelling (iv_r17).
- Overheating: derived from tree cover ESME modelling (wq_r10).
- Running Dry: Abstraction sustainability ESME modelling (ws_r27).
- Untreated SewageHigh
- ModificationLow
- Sewage (Private)Low
- Invasive SpeciesHigh
- LivestockMedium
- OverheatingLow
- RunoffHigh
- Running DryVery Low
Intervention hypothesis (confidence: High)
Wooleigh Brook appears to be a classic nutrient-management water body. The phosphate failure, RNAGs and existing measures all point towards nutrient reduction as the primary recovery pathway. Unlike some other rivers in the catchment, fish, invertebrates and phytobenthos are not exhibiting major ecological failures, indicating that the remaining gap to Good status is relatively focused and potentially achievable.
The most plausible recovery route is therefore nutrient reduction from SWW assets and improved nutrient management on priority farms. Upstream improvements in Whitsleigh Down Brook may also contribute to achieving recovery downstream.
| Intervention | Size of Intervention | Estimated Cost | Lead |
|---|---|---|---|
| PRIORITY INTERVENTIONS (NOT IN ORDER OF PRIORITY) | |||
| Investment in STWs (phosphate reduction) | £3m | SWW | |
| Investment in storm overflows (reduction in spills) | £7m | SWW | |