These occur when the sewers are overwhelmed, typically due to heavy or prolonged rainfall. To prevent flooding of homes, streets and treatment works, wastewater is discharged to the river.
Click the map to select a river catchment, or enter a postcode
Eco Class Good Moderate Poor Bad
Catchment Ranking: 29/92
Catchment Ranking
The ranking is derived from the EA 2025 classification data. Parameter scores are normalised and an average is taken. Rankings are restricted to prevent e.g. a "moderate" river being ranked higher than a "poor" river.
(92 river waterbodies in the North Devon Catchment)
EA Ecological Classification
- 2022Moderate
- 2019Moderate
- 2016Moderate
Failing Elements
- Phytobenthos Sub Element
EA RNAGs
- Poor nutrient management
- Sewage discharge (continuous)
- Trade/Industry discharge
Lower River Lew (Torridge)
Intermittent Discharges
South West Water Intermittent Sewage Discharges (hrs per year)
| Site Name | 2021 | 2022 | 2023 | 2024 | 2025 | Total |
|---|---|---|---|---|---|---|
| 11 HIGH STREET_CSO_HATHERLEIGH | 0 | 2 | 25 | 109 | 0 | 137 |
| 5A HIGH STREET_CSO_HATHERLEIGH | 1 | 0 | 1 | 2 | 0 | 4 |
| 8 HIGH STREET_CSO_HATHERLEIGH | 0 | 0 | 0 | 0 | 0 | 1 |
| BUDDLE LN_CSO_HATHERLEIGH | 0 | 0 | 0 | 0 | 0 | 0 |
| HATHERLEIGH BRIDGE_CSO_HATHERLEIGH | 336 | 178 | 435 | 435 | 154 | 1537 |
| HATHERLEIGH STW_SSO_HATHERLEIGH | 1307 | 483 | 297 | 678 | 855 | 3620 |
| MANOR HALL_CSO_HATHERLEIGH | 152 | 52 | 87 | 211 | 30 | 532 |
| SOUTH ST_CSO_HATHERLEIGH | 5 | 4 | 0 | 0 | 1 | 10 |
| Total | 1801 | 719 | 846 | 1434 | 1040 | 5840 |
South West Water Outlet Locations
- Properties on South West Water sewerage:
- 686
- Properties on Private Sewerage:
- 751
- Private sewerage per ha of catchment:
- 0.61
Continuous Discharge
This is the release of treated sewage and wastewater by SWW. Sewage Treatment Works (STW) and Water Treatment Works (WTW) are licenced by the Environment Agency (EA) to release capped levels of treated wastewater each day. The most recent data is for 2024 (SWW EPA data report).
Source of Phosphate
Phosphate Sources
Phosphate source data is from EA SAGIS modelling. Due to the difficulties in attributing phosphate to specific sources, this data should be treated with low confidence.
| Source | 2025 (%) | 2030 (%) |
|---|---|---|
| Continuous | 45.9 | 45.9 |
| Diffuse | 54.1 | 54.1 |
Risk Levels
Risk Levels
- SWW Overflows: Total duration of intermittent spills for all CSOs in the catchment for 2025.
- Private Sewage: Density rating based upon non-SWW properties in the catchment.
- Livestock: APHA data from Feb 2026.
- Runoff: ESME modelling (wf_r24).
- Modification: ESME modelling (aa_r1).
- Invasive Species: ESME modelling (iv_r17).
- Overheating: derived from tree cover ESME modelling (wq_r10).
- Running Dry: Abstraction sustainability ESME modelling (ws_r27).
- Untreated SewageHigh
- Sewage (Private)High
South West Water Asset Improvement Plans
Sewerage Improvements
From Water UK's national storm overflows plan (https://www.water.org.uk/overflows-plan), downloaded 13 August 2026: South West Water's planned improvements to each storm overflow, the year they're due, and the number of spills a year expected afterwards.
| Site Name | Improvements | Completion Date | Predicted no of spills pa |
|---|---|---|---|
| 11 HIGH STREET CSO | New screen. Other improvements to be confirmed | 2023 | 10 |
| 5A HIGH STREET CSO | New screen. Other improvements to be confirmed | 2023 | 10 |
| 8 HIGH STREET CSO | New screen. Other improvements to be confirmed | 2023 | 0 |
| BUDDLE LANE CSO | Storage, New screen, Nature-Based (e.g SuDS or Wetland Treatment), Bespoke solution. Other improvements to be confirmed | 2023 | 0 |
| HATHERLEIGH BRIDGE CSO | Storage, Increased pass forward flow/flow to treatment, New screen, Operational (e.g. blockages), Nature-Based (e.g SuDS or Wetland Treatment), Bespoke solution. Other improvements to be confirmed | 2035 | 10 |
| HATHERLEIGH STW | Storage, Increased pass forward flow/flow to treatment, Sealing of sewers, New screen, Operational (e.g. blockages). Other improvements to be confirmed | 2035 | 10 |
| MANOR HILL COMBINED SEWER OVERFLOW | Storage, New screen, Operational (e.g. blockages), Nature-Based (e.g SuDS or Wetland Treatment), Bespoke solution. Other improvements to be confirmed | 2035 | 10 |
| SOUTH STREET CSO | Storage, New screen, Operational (e.g. blockages), Nature-Based (e.g SuDS or Wetland Treatment), Bespoke solution. Other improvements to be confirmed | 2040 | 10 |